earthplatform.com

work performed

Environment Search Engine    

Results 1 - 10 from 617 for work performed in 0.295 sec.


ETAC: Benefits of Using ETAC
Strong involvement of the client. ETAC encourages clients to take an active role in the work performed on their behalf. ETAC staff gain insight into nuances of the client's requirements and ... many cases, ETAC can find or provide funding to further offset the cost of the work performed or to implement the recommendations. 3835 Green Pond Road Bethlehem, PA 18020-7699 • Phone: (610 ...
www.etctr.com


Post Jobs, Announcements, Listings, Groundwater Employment Opportunities
No Job Information Position / Title: Description: Start Date, Employment Type, Salary, Hours, Benefits, etc. Duties: Work Performed, Equipment, Methods & Materials, Physical Activities, etc. Qualifications / Requirements: Education, Training, Experience, Knowledge, Skills, Personal Characteristics ...
www.grac.org


LVI Services
All floors met or exceeded the schedule requirements. Newton Auditorium, Denver, Colorado LVI performed structural demolition, asbestos abatement and hazardous materials removal in this 80-year- ... systems. Total area of building is approximately 550,000 square feet. The work performed included abatement of: Asbestos-containing materials (fireproofing, floor tile/mastic/mechanical systems insulation ...
www.lviservices.com


NEIA :: NEWFOUNDLAND & LABRADOR ENVIRONMENTAL INDUSTRY ASSOCIATION
September 15 - 19, 2008. This certification is recognized in the US and Canada for work performed at uncontrolled waste sites. DCC and PWGSC are now requiring contractors to have this certification ...
neia.org


Green Environment inc.
SLAC. Performed historical document research, field investigation, and report preparation. Evaluated potential chemical impacts at various sites, developed sampling plans and project budgets, oversaw work performed by outside contractors/consultants, developed work scopes, and ...
greenenvironment.com


Leadership in Wastewater Recovery and Treatment reuse wastewater water reclamation wastewater treatment
Western United States. Pilot work performed in 1988 and 1989 by the University of Arizona Water Resources Center, funded by the ...
h2oreuse.com


2006 resolutions
French as a working language; and RECOGNISING the excellent work performed by the Finances and Administration Committee and the Secretariat NOW THEREFORE THE COMMISSION: INSTRUCTS the ...
iwcoffice.org


LVI Services
Total area of building is approximately 550,000 square feet. The work performed included the abatement of: Asbestos-containing materials (fireproofing, floor tile/mastic/mechanical systems ...
lviservices.com


LVI Services
Total area of building is approximately 550,000 square feet. The work performed included abatement of: Asbestos-containing materials (fireproofing, floor tile/mastic/mechanical systems insulation, ...
lviservices.com More from this site

Oklahoma State University Physical Plant - Work Order Request Form
Work performed by PPS In-House Trades personnel will be billed only for actual costs incurred. Billings for Physical Plant Work Orders are provided to campus departments on e~Print only. Work performed by the JOC Contractor will be billed on a fixed cost basis per an agreed upon JOC contract price. DOWNLOAD Physical Plant Work Order Request Form ...
www.pp.okstate.edu




The results are filtered
View all results for work performed